DOD SR400D Especificações Página 213

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 244
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 212
205
 13. Install the floor fasteners to the tie down sites and
push the sleeves to their lowest setting.
Depending on the make and model of the
helicopter, generally only 4 tie-down sites will line
up properly.
 14. Place the pesticide tank into the aircraft over the
tie-down fittings. For ease of handling, three
people are required to lift the assembly. DO NOT
USE THE BOOM TO LIFT OR MOVE THE UNIT
OR IT MAY BECOME PERMANENTLY BENT
AND MISALIGNED.
 15. Secure the pesticide tank to the tie down fittings.
 16. Secure the tie down straps on each of the four
corners of the tank cradle assembly. Attach the
other end of the straps to the floor tie-down rings
provided in the aircraft. The straps can be
crisscrossed. This allows for more stability.
 17. Check all nozzle and hose fittings to be sure they
are secure.
ELECTRICAL INSTALLATION
 18. Main power lead installation.
 a. UH-1 Aircraft:
 (1) Install the two-wire main power cable.
 (2) Route the cable on the inboard side of the left
Vista de página 212
1 2 ... 208 209 210 211 212 213 214 215 216 217 218 ... 243 244

Comentários a estes Manuais

Sem comentários